Station Ten: Final FEAD Assembly and Packaging
Once the engine passes the cold test, it’s placed back on the moving carrier for final FEAD assembly and crating. At the FEAD installation station, the alternator and A/C eliminator pulley is installed followed by the FEAD drive belt.
Once the engine is complete, the assembly is placed in a custom wood crate in preparation for the trip south to Flat Rock Michigan.
Team members of the Romeo Niche line stand proudly around one of the completed 2010 Cobra Jet Mustangs. The 2008, 2010 and 2012 Cobra Jet programs would not have been possible without their efforts combined with the final assembly of the car by the team members at AAI assembly.