Halo & Welding-
The roof tubes are now in place.
The rear section has been removed for finishing welds and additional bracketry.
You can see the short support tubes we added to reinforce the upper shock mounts. Also, the anti-roll bar has been located.
We moved the rear section to “Home Plate”, which is the solid steel welding table. This will allow for easy access for completion of all welds.
Jonathan Savoy was recruited to help out with the mass welding. His superior welding skills were needed to acheive strong and appealing welds. Thanks Jonathan, great work man!
More gusset tubes were added between upper and lower sections towards the rear. Each gusset tube increases the strength of the main tubes, creating more rigidity throughout the entire structure.
We have located the fuel cell and created support tubes and mounting tabs to affix the cell to the chassis. The 1 1/2″ cross tube for the fuel cell will be a shared support for the battery tray.